



RUTLAND COURT
RUTLAND COURT
Architect: DTA
Structural Engineer: Melllss LLP
Construction Cost: £2.5m
M&E Consultant: Hira & Khalique
Main Contractor: SrayMax Construction
Services Provided: Central Heating & Hot Water Plant Room, Central Hot & Cold Water Distribution, Space Heating, Ventilation, Above Ground Drainage, Electrical Load Assessment, Power Distribution, Fire & Security, Mechanical Control Panel, IT, Access Control System, Utilities Compliance, Building Control Approval
Description: Listed building converted into luxury 1 bed 11 rooms hotel in Marylebone.
Architect: DTA
Structural Engineer: Melllss LLP
Construction Cost: £2.5m
M&E Consultant: Hira & Khalique
Main Contractor: SrayMax Construction
Services Provided: Central Heating & Hot Water Plant Room, Central Hot & Cold Water Distribution, Space Heating, Ventilation, Above Ground Drainage, Electrical Load Assessment, Power Distribution, Fire & Security, Mechanical Control Panel, IT, Access Control System, Utilities Compliance, Building Control Approval
Description: Listed building converted into luxury 1 bed 11 rooms hotel in Marylebone.
Hotel & Leisure
WHAT
WHAT
Hotel & Leisure
WHERE
Knightsbridge, London
Knightsbridge, London
WHERE
March 2017
WHEN
WHEN
March 2017

Heating Cooling Networks
-
Various low carbon energy centres, piping infrastructures, usage diversities, computer modelling, simulation studies, delivery temperatures
-
Valves and instrumentation, system optimization
-
Hydraulic layouts: boilers only, boilers- CHP, boilers- CHP- ASHP, boilers- GHSP, ASHP, ambient loops, water cooled condensers, air-water chillers, cooling towers
-
Hybrid powerplants
-
Engineering calculations
-
Hydraulic analysis
-
Network losses, heat dissipation
-
Network routes and distribution
-
Retrofit design
-
Water treatment
-
Control systems
-
Control strategies
-
Commissioning and testing
-
Data monitoring
-
Defects finding
-
Independent reviews
-
Technical reports
