



RUTLAND COURT
RUTLAND COURT
Architect: DTA
Structural Engineer: Melllss LLP
Construction Cost: £2.5m
M&E Consultant: Hira & Khalique
Main Contractor: SrayMax Construction
Services Provided: Central Heating & Hot Water Plant Room, Central Hot & Cold Water Distribution, Space Heating, Ventilation, Above Ground Drainage, Electrical Load Assessment, Power Distribution, Fire & Security, Mechanical Control Panel, IT, Access Control System, Utilities Compliance, Building Control Approval
Description: Listed building converted into luxury 1 bed 11 rooms hotel in Marylebone.
Architect: DTA
Structural Engineer: Melllss LLP
Construction Cost: £2.5m
M&E Consultant: Hira & Khalique
Main Contractor: SrayMax Construction
Services Provided: Central Heating & Hot Water Plant Room, Central Hot & Cold Water Distribution, Space Heating, Ventilation, Above Ground Drainage, Electrical Load Assessment, Power Distribution, Fire & Security, Mechanical Control Panel, IT, Access Control System, Utilities Compliance, Building Control Approval
Description: Listed building converted into luxury 1 bed 11 rooms hotel in Marylebone.
Hotel & Leisure
WHAT
WHAT
Hotel & Leisure
WHERE
Knightsbridge, London
Knightsbridge, London
WHERE
March 2017
WHEN
WHEN
March 2017


145 Kensington Church Street
Mixed Use Residential Development
Client: Savills
Energy Consultant: Hira & Khalique Engineer
Services Provided:
-
2013 SAP Analysis
-
Part L compliance
-
fabric report
-
materials selection
-
renewable technologies
-
water cooled VRF assessment
​
WHAT
Mixed Use
WHERE
High Street Kensington
WHEN
2018
